SSP-1 Programmable Systems Simulator Didactic Equipment Electrical Engineering Lab Equipment
System Simulator mod. SSP-1 is equipped with 20 interchangeable masks, thus it cam reproduce different installations with sequential and analog control. Simple electric connections can interface the process reproduced on the mask to PLC inputs and outputs. TRAINING PROGRAM: The training program includes the following exercises: 1 - FILLING A BIN Managing the process control for filling a bin 2 - ELEVATOR Controlling an elevator moving on 4 floors 3 - PEDESTRIAN TRAFFIC LIGHT Controlling a traffic light unit on main road with pedestriancrossing 4 - STARTING AN ASYNCHRONOUS WOUND-ROTOR MOTOR Controlling the starting sequence by 1, 2 or 3 (selectable) steps.Resetting the initial conditions at stop 5 - STARTING DAHLANDER MOTOR Controlling the HIGH / LOW motor speed 6 - REVERSAL OF ROTATION OF ASYNCHRONOUS MOTOR Controlling the direction of rotation of the motor 7 - STAR-DELTA START OF ASYNCHRONOUS MOTOR Controlling the D/Y starting sequence at adjustable times;resetting the initial conditions at stop 8 - SEQUENTIAL NEON SIGN Controlling different programs of sequential lighting of 1 to8 lamps, with separate variation of lighting times; operation:AUTO/MAN and UP/DOWN 9 - DRINK MACHINE Simulating the different operation sequences of a drinkmachine 10 - REACTOR Managing the reaction with control of refrigerant (hot andcold) and of mixer
11 - MIXER Controlling the mixing process of different substances 12 - STARTING AN ASYNCHRONOUS MOTOR Starting sequence of an asynchronous motor 13 - CAR PARK Controlling a car park with indications of “FULL” and of “FREEBAYS” 14 - COMPRESSED AIR NETWORK Controlling compressors and tank for production anddistribution of compressed air 15 - CONVEYOR BELTS 1 Transport of sandy material controlled by three conveyor belts 16 - CONVEYOR BELTS 2 Controlling conveyor belts for the transport of various products 17 - FILLING SYSTEM 1 Automatic filling process of tablets 18 - FILLING SYSTEM 2 Filling process of three tanks 19 - MACHINING LINE Implementation of different sequences by the use of all thephase or of some of them 20 - MONITORING THE OPERATION OF FOUR PUMPS Controlling the operation of four pumps for testing pressureinside a distribution network TECHNICAL SPECIFICATIONS: This System Simulator consists of a panel that can be used astabletop unit or mounted on vertical frame. It includes 12 inputs and 12 digital outputs connected via safetyleads with plugs of Ø 4 mm. Two potentiometers enable to settwo analog variables (0 – 10 V) used, for instance, to indicatethe filling rate of a bin, the up and down movements of anelevator, etc… 6 instantaneous contacts held by switches and 6 LEDs of stateindication are available on the fore panel. A bargraph display will show the level of a tank or the positionof an elevator; 6 electric limit switches enable to monitor theminimum/maximum positions, as well as the intermediatepositions. Power supply: 24 Vdc (output by the PLC) Dimensions: 390 x 297 x 100 mm Net weight: 5 kg